TEIs Rel-18

 RAN1#112-bis-e

9.166   TEIs

R1-2302385 Rel-18 TEI proposal on HARQ multiplexing on PUSCH Huawei, HiSilicon, Ericsson, China Unicom

R1-2302400 RAN1 TEI proposals for Release 18 Nokia, Nokia Shanghai Bell

R1-2302513 Rel-18 TEI proposals vivo

R1-2302576 TEI on the introduction of a UE capability with up to 6-layer DL MIMO OPPO

R1-2302762 On PUSCH repetition type A scheduled by DCI format 0-0 with CRC scrambled by C-RNTI ZTE, China Telecom, Sanechips

R1-2302973 Rel-18 TEI on pathloss RS for Type 1 CG PUSCH xiaomi

R1-2303620 Rel-18 RAN1 TEI proposals Qualcomm Incorporated

R1-2303851 Proposals for Rel-18 TEI Ericsson, Verizon, Qualcomm

 

[112bis-e-R18-TEIs-01] Shinya (NTT DOCOMO)

Email discussion on Rel-18 TEI proposals April 26th

-        Check points: April 21, April 26

R1-2304077 Summary #1 on Rel-18 TEIs Moderator (NTT DOCOMO, INC.)

From April 20th GTW session,

Following proposals are considered:

        TEI proposal #10: Enhancement for HARQ multiplexing on PUSCH

o   Continue discussion to address the concern from ZTE

        TEI proposal #1: Multi-PxSCH scheduling with single DCI

o   Continue discussion and check the view of opponents (CATT, MediaTek)

        TEI proposal #4: PUSCH repetition type A for a PUSCH scheduled by DCI format 0_0 with CRC scrambled by C-RNTI

o   No more discussion in this meeting

        TEI proposal #3: PUSCH antenna switching

o   No more discussion in this meeting

 

TEI proposal #10

The restriction on scheduling PDSCH after UL grant should be removed for the case of PUSCH with repetitions

  An RRC parameter to configure the function of scheduling PDSCH after a UL DCI format and multiplexing associated HARQ on the PUSCH scheduled by the DCI format can be introduced in Rel-18.

  Note: When the restriction on scheduling PDSCH after UL grant is released for PUSCH with repetition case, UE generates type1/3 HARQ-ACK CB according to the existing specification.

  Note: Above proposal applies to type HARQ-ACK 1/3 CB. FFS: type-2 HARQ-ACK CB

  Note, the PUSCH with repetitions can be scheduled/configured by gNB.

  FFS: case of PUSCH without repetitions

  This feature is subject to UE capability.

Companies with concerns: ZTE

 

 

TEI proposal #1

Introduce UE feature(s) for multi-PUSCH scheduling with single DCI 0_1 for non-contiguous slots in FR1 for all defined SCSs

        Note: there is no RAN1 impact

Introduce UE feature(s) for multi-PDSCH scheduling with single DCI 1_1 for contiguous/non-contiguous slots in FR1 for all defined SCSs

        Note: there is no RAN1 impact.

Companies with concerns: CATT, MTK

 

 

R1-2304108 Summary #2 on Rel-18 TEIs Moderator (NTT DOCOMO, INC.)

From April 24th GTW session,

Agreement (proposal #1)

Introduce UE feature(s) for multi-PUSCH scheduling with single DCI 0_1 for non-contiguous slots in FR1 for all defined SCSs

        Note: there is no RAN1 impact

 

TEI proposal #13

Rel-18 TEI proposal on pathloss RS for Type 1 CG-PUSCH is agreed. Relevant TP for clause 7.1.1 in TS 38.213 is endorsed.

7.1.1 UE behaviour

<Unchanged parts are omitted>

- For a PUSCH transmission configured by ConfiguredGrantConfig, if rrc-ConfiguredUplinkGrant is included in ConfiguredGrantConfig,

-                   if the UE is provided enablePL-RS-UpdateForPUSCH-SRS, the UE determines a RS resource index from the value of PUSCH-PathlossReferenceRS-Id that is mapped to the sri-PUSCH-PowerControlId indicated by the srs-ResourceIndicator value included in rrc-ConfiguredUplinkGrant

-                   if the UE is not provided enablePL-RS-UpdateForPUSCH-SRS, a RS resource index is provided by a value of pathlossReferenceIndex included in rrc-ConfiguredUplinkGrant where the RS resource is either on serving cell or, if provided, on a serving cell indicated by a value of pathlossReferenceLinking

<Unchanged parts are omitted>

 

From email decision posted on April 26th, no consensus to endorse proposals #10 and #13.

 

Final summary in R1-2304223.


 RAN1#113

9.155   TEIs

[113-R18-TEIs] Shinya (NTT DOCOMO)

Email discussion on Rel-18 TEIs

-        To be used for sharing updates on online/offline schedule, details on what is to be discussed in online/offline sessions, tdoc number of the moderator summary for online session, etc

 

R1-2305964 Rel-18 TEI proposal on eCP support for NR MBS CBN, China Telecom, China Unicom, CATT, Huawei, HiSilicon, ZTE, Sanechip (rev of R1-2305917)

       Observation 1: The specification allowing only normal CP for 15kHz and 30kHz subcarrier spacing unnecessarily imposes the limits to the deployments of MBS.

       Observation 2: Extended CP can help improve the special efficiency for MBS transmission.

       Observation 3: The specification impact to RAN1 is minor including, i.e., changes to TS 38.211 clause 4.2 Table 4.2-1 and clause 4.3.2 Table 4.3.2-2, and TS 38.213 clause 11.1.1 for slot format determination.

       Observation 4: RAN2 can directly incorporate the necessary signalling for the configuration of normal or extended CP for the CFR via a CR.

       Proposal: Specify the support of extended CP for the 15kHz and 30kHz subcarrier spacing by scaling based on eCP for 60 kHz SCS for MBS broadcast and multicast transmission as a Rel-18 TEI.

Decision: The document is noted.

 

R1-2304602 On PUSCH repetition type A scheduled by DCI format 0-0 with CRC scrambled by C-RNTI ZTE, China Telecom, Sanechips

R1-2304675 Rel-18 TEI proposal on HARQ multiplexing on PUSCH Huawei, HiSilicon, Ericsson, China Unicom

R1-2304888 Rel-18 TEI on pathloss RS for Type 1 CG PUSCH xiaomi

R1-2305408 TEI on the introduction of a UE capability with up to 6-layer DL MIMO OPPO

R1-2305366 Rel-18 RAN1 TEI proposals Qualcomm Incorporated

 

R1-2304433 On SRS Imbalance InterDigital

To be discussed in agenda item 5.

 

R1-2305628 Summary #1 on Rel-18 TEIs Moderator (NTT DOCOMO, INC.)

From Thursday session

Agreement

If UCI multiplexing of different priorities is not enabled, the restriction on scheduling PDSCH after UL grant is removed for the case of PUSCH with repetitions except the first repetition

 

Agreement

Rel-18 TEI proposal on pathloss RS for Type 1 CG-PUSCH is agreed. Relevant TP for clause 7.1.1 in TS 38.213 is endorsed in principle

         Note: Corresponding UE capability and RRC configuration will be introduced and discussed in future meetings.

7.1.1 UE behaviour

<Unchanged parts are omitted>

- For a PUSCH transmission configured by ConfiguredGrantConfig, if rrc-ConfiguredUplinkGrant is included in ConfiguredGrantConfig,

-        if the UE is provided [enablePL-RS-UpdateForType1CG-PUSCH-SRS], the UE determines a RS resource index qd from the value of PUSCH-PathlossReferenceRS-Id that is mapped to the sri-PUSCH-PowerControlId indicated by the srs-ResourceIndicator value included in rrc-ConfiguredUplinkGrant

-        if the UE is not provided [enablePL-RS-UpdateForType1CG-PUSCH-SRS], a RS resource index qd is provided by a value of pathlossReferenceIndex included in rrc-ConfiguredUplinkGrant where the RS resource is either on serving cell c or, if provided, on a serving cell indicated by a value of pathlossReferenceLinking

<Unchanged parts are omitted>

 

Final summary in R1-2306242.

 

 

From AI 5

R1-2304328 Reply LS on 1-symbol PRS RAN2, ZTE

R1-2306138 Moderator summary for LS on 1-symbol PRS ZTE

From Thursday session

Agreement

Send the following to RAN2 in response to R1-2304328.

RAN1 would like to thank RAN2s reply R2-2304510(R1-2304328) on 1-symbol PRS.

With regard to RAN2s question, RAN1 thinks the changes to DL PRS configuration used for RTT-based Propagation Delay Compensation are needed. In addition, RAN1 proposes the following note to be added in the numSymbols field description:

       Note: The UE does not expect to be configured for PDC with a PRS with numSymbols equals to n1 unless an SSB index is provided as a Type-C or Type-C & Type-D QCL source, or another PRS resource with numSymbols more than 1 is provided as QCL source.

Furthermore, RAN1 does not expect RRM requirements to be defined for 1-symbol PRS in PDC.

R1-2306212 Reply LS on 1-symbol PRS RAN1, ZTE

Decision: The LS is approved.


 RAN1#114

9.155   TEIs

[114-R18-TEIs] Shinya (DOCOMO)

Email discussion on Rel-18 TEIs

-        To be used for sharing updates on online/offline schedule, details on what is to be discussed in online/offline sessions, tdoc number of the moderator summary for online session, etc

 

R1-2306882 Rel-18 TEI on complexity reduction solutions for FR2 Spreadtrum Communications

Thursday decision: After discussions/review with mobile operators and different vendors, proponent has agreed that the proposed enhancements should not be further considered in this meeting.

 

R1-2306988 On PUSCH repetition type A scheduled by DCI format 0-0 with CRC scrambled by C-RNTI ZTE, China Telecom, Sanechips, NTT DOCOMO, INC.

R1-2307518 TEI on the introduction of a UE capability with up to 6-layer DL MIMO OPPO, CMCC, China Telecom, NTT DOCOMO, Lenovo, China Unicom

R1-2307958 Rel-18 RAN1 TEI proposals Qualcomm Incorporated

 

R1-2308312 Summary #1 on Rel-18 TEIs Moderator (NTT DOCOMO, INC.)

From Monday session

       TEI proposal #1: UE capability with up to 6-layer DL MIMO

o   No consensus. As per RAN1 chairs guidance, no more discussion is expected in Rel-18.

       TEI proposal #2: PUSCH repetition type A for a PUSCH scheduled by DCI format 0_0 with CRC scrambled by C-RNTI

o   No consensus. As per RAN1 chairs guidance, no more discussion is expected in Rel-18.

       TEI proposal #3: Enhanced PDCCH reception for mDCI based mTRP

o   Comeback on Thursday

       TEI proposal #4: Enhancement for scheduling request

o   Comeback on Thursday

       TEI proposal #5: Further complexity reductions for FR2 RedCap

o   Comeback on Thursday

 

 

R1-2308485 Summary #2 on Rel-18 TEIs Moderator (NTT DOCOMO, INC.)

From Thursday session

TEI proposal #3:

Agreement

For multi-DCI based multi-TRP operation, support the following:

       QCL-TypeD prioritization rules for overlapping CORESETs is performed per coresetPoolIndex value.

o   Adopt following TP in Clause 10.1 in TS 38.213.

--Unchanged part omitted------------------------

If a UE

- is configured for single cell operation or for operation with carrier aggregation in a same frequency band, and

- monitors PDCCH candidates in overlapping PDCCH monitoring occasions in multiple CORESETs that have been configured with same or different qcl-Type set to 'typeD' properties on active DL BWP(s) of one or more cells

the UE monitors PDCCHs only in a CORESET, and in any other CORESET from the multiple CORESETs that have been configured with qcl-Type set to same 'typeD' properties as the CORESET, on the active DL BWP of a cell from the one or more cells

- the CORESET corresponds to the CSS set with the lowest index in the cell with the lowest index containing CSS, if any; otherwise, to the USS set with the lowest index in the cell with lowest index

- the lowest USS set index is determined over all USS sets with at least one PDCCH candidate in overlapping PDCCH monitoring occasions

If a UE

- is not provided coresetPoolIndex for first CORESETs, or is provided coresetPoolIndex with value 0 for first CORESETs, and

- is provided coresetPoolIndex with value 1 for second CORESETs, and

- is provided [twoQCLTypeDforMulti-DCI]

the UE applies procedures described above independently across the first CORESETs and the second CORESETs.

--Unchanged part omitted------------------------

       Introduce a UE capability for the red part of the above text.

 

No consensus regarding TEI proposal #4 and #5.

 

 

From AI 5

R1-2306387 LS on longer CG-SDT periodicities RAN2, Ericsson

Decision: Discussion on response LS to be handled in agenda item 9.15. To be moderated by Shinya (NTT DOCOMO).

R1-2308486 Draft reply LS on longer CG-SDT periodicities Moderator (NTT DOCOMO, INC.)

Decision from Thursday session: The draft LS is endorsed. Final version is approved in R1-2308487.

 

 

Final summary in R1-2308553.