TEIs Rel-18

 RAN1#112-bis-e

9.166   TEIs

R1-2302385         Rel-18 TEI proposal on HARQ multiplexing on PUSCH          Huawei, HiSilicon, Ericsson, China Unicom

R1-2302400         RAN1 TEI proposals for Release 18              Nokia, Nokia Shanghai Bell

R1-2302513         Rel-18 TEI proposals        vivo

R1-2302576         TEI on the introduction of a UE capability with up to 6-layer DL MIMO               OPPO

R1-2302762         On PUSCH repetition type A scheduled by DCI format 0-0 with CRC scrambled by C-RNTI ZTE, China Telecom, Sanechips

R1-2302973         Rel-18 TEI on pathloss RS for Type 1 CG PUSCH     xiaomi

R1-2303620         Rel-18 RAN1 TEI proposals            Qualcomm Incorporated

R1-2303851         Proposals for Rel-18 TEI   Ericsson, Verizon, Qualcomm

 

[112bis-e-R18-TEIs-01] – Shinya (NTT DOCOMO)

Email discussion on Rel-18 TEI proposals April 26th

-        Check points: April 21, April 26

R1-2304077        Summary #1 on Rel-18 TEIs         Moderator (NTT DOCOMO, INC.)

From April 20th GTW session,

Following proposals are considered:

·        TEI proposal #10: Enhancement for HARQ multiplexing on PUSCH

o   Continue discussion to address the concern from ZTE

·        TEI proposal #1: Multi-PxSCH scheduling with single DCI

o   Continue discussion and check the view of opponents (CATT, MediaTek)

·        TEI proposal #4: PUSCH repetition type A for a PUSCH scheduled by DCI format 0_0 with CRC scrambled by C-RNTI

o   No more discussion in this meeting

·        TEI proposal #3: PUSCH antenna switching

o   No more discussion in this meeting

 

TEI proposal #10

The restriction on scheduling PDSCH after UL grant should be removed for the case of PUSCH with repetitions

Ø  An RRC parameter to configure the function of scheduling PDSCH after a UL DCI format and multiplexing associated HARQ on the PUSCH scheduled by the DCI format can be introduced in Rel-18.

Ø  Note: When the restriction on scheduling PDSCH after UL grant is released for PUSCH with repetition case, UE generates type1/3 HARQ-ACK CB according to the existing specification.

Ø  Note: Above proposal applies to type HARQ-ACK 1/3 CB. FFS: type-2 HARQ-ACK CB

Ø  Note, the PUSCH with repetitions can be scheduled/configured by gNB.

Ø  FFS: case of PUSCH without repetitions

Ø  This feature is subject to UE capability.

Companies with concerns: ZTE

 

 

TEI proposal #1

Introduce UE feature(s) for multi-PUSCH scheduling with single DCI 0_1 for non-contiguous slots in FR1 for all defined SCSs

·        Note: there is no RAN1 impact

Introduce UE feature(s) for multi-PDSCH scheduling with single DCI 1_1 for contiguous/non-contiguous slots in FR1 for all defined SCSs

·        Note: there is no RAN1 impact.

Companies with concerns: CATT, MTK

 

 

R1-2304108        Summary #2 on Rel-18 TEIs         Moderator (NTT DOCOMO, INC.)

From April 24th GTW session,

Agreement (proposal #1)

Introduce UE feature(s) for multi-PUSCH scheduling with single DCI 0_1 for non-contiguous slots in FR1 for all defined SCSs

·        Note: there is no RAN1 impact

 

TEI proposal #13

Rel-18 TEI proposal on pathloss RS for Type 1 CG-PUSCH is agreed. Relevant TP for clause 7.1.1 in TS 38.213 is endorsed.

7.1.1 UE behaviour

<Unchanged parts are omitted>

-  For a PUSCH transmission configured by ConfiguredGrantConfig, if rrc-ConfiguredUplinkGrant is included in ConfiguredGrantConfig,

-                   if the UE is provided enablePL-RS-UpdateForPUSCH-SRS, the UE determines a RS resource index  from the value of PUSCH-PathlossReferenceRS-Id that is mapped to the sri-PUSCH-PowerControlId indicated by the srs-ResourceIndicator value included in rrc-ConfiguredUplinkGrant

-                   if the UE is not provided enablePL-RS-UpdateForPUSCH-SRS, a RS resource index  is provided by a value of pathlossReferenceIndex included in rrc-ConfiguredUplinkGrant where the RS resource is either on serving cell  or, if provided, on a serving cell indicated by a value of pathlossReferenceLinking

<Unchanged parts are omitted>

 

From email decision posted on April 26th, no consensus to endorse proposals #10 and #13.

 

Final summary in R1-2304223.


 RAN1#113

9.155   TEIs

[113-R18-TEIs] – Shinya (NTT DOCOMO)

Email discussion on Rel-18 TEIs

-        To be used for sharing updates on online/offline schedule, details on what is to be discussed in online/offline sessions, tdoc number of the moderator summary for online session, etc

 

R1-2305964         Rel-18 TEI proposal on eCP support for NR MBS CBN, China Telecom, China Unicom, CATT, Huawei, HiSilicon, ZTE, Sanechip              (rev of R1-2305917)

·       Observation 1: The specification allowing only normal CP for 15kHz and 30kHz subcarrier spacing unnecessarily imposes the limits to the deployments of MBS.

·       Observation 2: Extended CP can help improve the special efficiency for MBS transmission.

·       Observation 3: The specification impact to RAN1 is minor including, i.e., changes to TS 38.211 clause 4.2 Table 4.2-1 and clause 4.3.2 Table 4.3.2-2, and TS 38.213 clause 11.1.1 for slot format determination.

·       Observation 4: RAN2 can directly incorporate the necessary signalling for the configuration of normal or extended CP for the CFR via a CR.

·       Proposal: Specify the support of extended CP for the 15kHz and 30kHz subcarrier spacing by scaling based on eCP for 60 kHz SCS for MBS broadcast and multicast transmission as a Rel-18 TEI.

Decision: The document is noted.

 

R1-2304602         On PUSCH repetition type A scheduled by DCI format 0-0 with CRC scrambled by C-RNTI             ZTE, China Telecom, Sanechips

R1-2304675         Rel-18 TEI proposal on HARQ multiplexing on PUSCH              Huawei, HiSilicon, Ericsson, China Unicom

R1-2304888         Rel-18 TEI on pathloss RS for Type 1 CG PUSCH     xiaomi

R1-2305408         TEI on the introduction of a UE capability with up to 6-layer DL MIMO   OPPO

R1-2305366         Rel-18 RAN1 TEI proposals           Qualcomm Incorporated

 

R1-2304433         On SRS Imbalance            InterDigital

To be discussed in agenda item 5.

 

R1-2305628         Summary #1 on Rel-18 TEIs         Moderator (NTT DOCOMO, INC.)

From Thursday session

Agreement

If UCI multiplexing of different priorities is not enabled, the restriction on scheduling PDSCH after UL grant is removed for the case of PUSCH with repetitions except the first repetition

 

Agreement

Rel-18 TEI proposal on pathloss RS for Type 1 CG-PUSCH is agreed. Relevant TP for clause 7.1.1 in TS 38.213 is endorsed in principle

·         Note: Corresponding UE capability and RRC configuration will be introduced and discussed in future meetings.

7.1.1         UE behaviour

<Unchanged parts are omitted>

-   For a PUSCH transmission configured by ConfiguredGrantConfig, if rrc-ConfiguredUplinkGrant is included in ConfiguredGrantConfig,

-        if the UE is provided [enablePL-RS-UpdateForType1CG-PUSCH-SRS], the UE determines a RS resource index qd from the value of PUSCH-PathlossReferenceRS-Id that is mapped to the sri-PUSCH-PowerControlId indicated by the srs-ResourceIndicator value included in rrc-ConfiguredUplinkGrant

-        if the UE is not provided [enablePL-RS-UpdateForType1CG-PUSCH-SRS], a RS resource index qd is provided by a value of pathlossReferenceIndex included in rrc-ConfiguredUplinkGrant where the RS resource is either on serving cell c or, if provided, on a serving cell indicated by a value of pathlossReferenceLinking

<Unchanged parts are omitted>

 

Final summary in R1-2306242.

 

 

From AI 5

R1-2304328         Reply LS on 1-symbol PRS            RAN2, ZTE

R1-2306138         Moderator summary for LS on 1-symbol PRS        ZTE

From Thursday session

Agreement

Send the following to RAN2 in response to R1-2304328.

RAN1 would like to thank RAN2’s reply R2-2304510(R1-2304328) on 1-symbol PRS.

With regard to RAN2’s question, RAN1 thinks the changes to DL PRS configuration used for RTT-based Propagation Delay Compensation are needed. In addition, RAN1 proposes the following note to be added in the numSymbols field description:

·       Note: The UE does not expect to be configured for PDC with a PRS with numSymbols equals to n1 unless an SSB index is provided as a Type-C or Type-C & Type-D QCL source, or another PRS resource with numSymbols more than 1 is provided as QCL source.

Furthermore, RAN1 does not expect RRM requirements to be defined for 1-symbol PRS in PDC.

R1-2306212         Reply LS on 1-symbol PRS            RAN1, ZTE

Decision: The LS is approved.


 RAN1#114

9.155   TEIs

[114-R18-TEIs] – Shinya (DOCOMO)

Email discussion on Rel-18 TEIs

-        To be used for sharing updates on online/offline schedule, details on what is to be discussed in online/offline sessions, tdoc number of the moderator summary for online session, etc

 

R1-2306882         Rel-18 TEI on complexity reduction solutions for FR2              Spreadtrum Communications

Thursday decision: After discussions/review with mobile operators and different vendors, proponent has agreed that the proposed enhancements should not be further considered in this meeting.

 

R1-2306988         On PUSCH repetition type A scheduled by DCI format 0-0 with CRC scrambled by C-RNTI             ZTE, China Telecom, Sanechips, NTT DOCOMO, INC.

R1-2307518         TEI on the introduction of a UE capability with up to 6-layer DL MIMO   OPPO, CMCC, China Telecom, NTT DOCOMO, Lenovo, China Unicom

R1-2307958         Rel-18 RAN1 TEI proposals           Qualcomm Incorporated

 

R1-2308312         Summary #1 on Rel-18 TEIs         Moderator (NTT DOCOMO, INC.)

From Monday session

·       TEI proposal #1: UE capability with up to 6-layer DL MIMO

o   No consensus. As per RAN1 chair’s guidance, no more discussion is expected in Rel-18.

·       TEI proposal #2: PUSCH repetition type A for a PUSCH scheduled by DCI format 0_0 with CRC scrambled by C-RNTI

o   No consensus. As per RAN1 chair’s guidance, no more discussion is expected in Rel-18.

·       TEI proposal #3: Enhanced PDCCH reception for mDCI based mTRP

o   Comeback on Thursday

·       TEI proposal #4: Enhancement for scheduling request

o   Comeback on Thursday

·       TEI proposal #5: Further complexity reductions for FR2 RedCap

o   Comeback on Thursday

 

 

R1-2308485         Summary #2 on Rel-18 TEIs         Moderator (NTT DOCOMO, INC.)

From Thursday session

TEI proposal #3:

Agreement

For multi-DCI based multi-TRP operation, support the following:

·       QCL-TypeD prioritization rules for overlapping CORESETs is performed per coresetPoolIndex value.

o   Adopt following TP in Clause 10.1 in TS 38.213.

--Unchanged part omitted------------------------

If a UE

-      is configured for single cell operation or for operation with carrier aggregation in a same frequency band, and

-      monitors PDCCH candidates in overlapping PDCCH monitoring occasions in multiple CORESETs that have been configured with same or different qcl-Type set to 'typeD' properties on active DL BWP(s) of one or more cells

the UE monitors PDCCHs only in a CORESET, and in any other CORESET from the multiple CORESETs that have been configured with qcl-Type set to same 'typeD' properties as the CORESET, on the active DL BWP of a cell from the one or more cells

-      the CORESET corresponds to the CSS set with the lowest index in the cell with the lowest index containing CSS, if any; otherwise, to the USS set with the lowest index in the cell with lowest index

-      the lowest USS set index is determined over all USS sets with at least one PDCCH candidate in overlapping PDCCH monitoring occasions

If a UE

-      is not provided coresetPoolIndex for first CORESETs, or is provided coresetPoolIndex with value 0 for first CORESETs, and

-      is provided coresetPoolIndex with value 1 for second CORESETs, and

-      is provided [twoQCLTypeDforMulti-DCI]

the UE applies procedures described above independently across the first CORESETs and the second CORESETs.

--Unchanged part omitted------------------------

·       Introduce a UE capability for the red part of the above text.

 

No consensus regarding TEI proposal #4 and #5.

 

 

From AI 5

R1-2306387         LS on longer CG-SDT periodicities            RAN2, Ericsson

Decision: Discussion on response LS to be handled in agenda item 9.15. To be moderated by Shinya (NTT DOCOMO).

R1-2308486         Draft reply LS on longer CG-SDT periodicities      Moderator (NTT DOCOMO, INC.)

Decision from Thursday session: The draft LS is endorsed. Final version is approved in R1-2308487.

 

 

Final summary in R1-2308553.